Top Skip to main content
top_frame
logo_frame

MINISTRY OF TRANSPORTATION AND COMMUNICATIONS, R.O.C.

language_frame
::: Home |  Sitemap |  中文版 |  Contact us |  Q&A |  RSS
 
 
Audio / Video
Video on Taiwan
::: MOTC News
 
 
::: HOME > MOTC News > MOTC News
 
  友善列印 回上頁
font_frame
Font size
Small fontsize Middle fontsize Large fontsize

MOTC News

Multi Web Release Information

Completion of Wharf No. 36 Enables Port of Taichung to Fully Promote National Offshore Wind Farm Development Goals

*  category: Water Transport
*  Business category: Unscheduled news conferences
*  Publish Date: 2021-02-05
*  Units: Port of Taichung,Taiwan International Ports Corporation, Ltd.
 
*  Content:

Port of Taichung, TIPC has a key role to play in helping the Executive Yuan achieve the nationwide target of 5.7GW installed offshore wind farm generation capacity by 2025. Wharf Nos. 2, 5A, 5B, 36, and 106 and adjacent land at the port have already been reserved for firms to use in the manufacture, storage, assembly, and transport of wind turbines and related components. The infrastructure improvements at the port necessary to keep Taiwan’s wind farm development program on schedule wrapped up last year (2020) with the completion of Wharf 36 on October 21st.

According to an official statement, Wharf 36, built at a cost of NT$1.15 billion, extends for 340m in length and has a water depth of -16m and berth apron of 38m. In terms of uniformly distributed load (UDL) capacities, a 50m-long section of the wharf platform is rated at 40T/m2, while the remainder (290m) is rated at 20T/m2, giving the wharf the structural strength necessary to handle jack-up barges. Seabed reinforcement using a 4m-thick layer of stone in a 140x80m area off the berth further provides anchorage foundation support to turbine installation vessel offloading/onloading operations at 90T/m2. Moreover, in compliance with Taiwan eco-port promotion policies, all pipes installed for drainage and freshwater/electricity supplies meet current green / eco-port standards.

Port of Taichung President Sean Lu notes that Ørsted Taiwan has leased Wharf 36 together with 35ha of land adjacent to Wharf Nos. 35~37. The company has announced it will use its Port of Taichung base to receive wind turbine parts and to build and ship out turbine assemblies. The company will develop the southeast and southwest sections of the Greater Changhua wind farm area (total 900MW) during phase one (2020 – 2022) and the northwest and northeast sections of the same (total 920MW) during phase two (2025 – 2026). Active competition for these contracts are keeping Taiwan firmly on the path set by the Executive Yuan toward becoming a key center of green energy development in Asia.

 

*  Contact: Huang Wei-cheng
*  Phone: 04-2664-2550
*  E-Mail: Dandes@twport.com.tw
*
相關連結
相關附件
相關圖片
*
Visitor:416     Update:110-02-05
Top
MINISTRY OF TRANSPORTATION AND COMMUNICATIONS R.O.C.
foot_frame
Contact Us Privacy Policy Information Security Policy     Last updated:2021-05-10
No.50, Sec. 1, Ren’ai Rd., Zhongzheng District, Taipei City 100020, Taiwan (R.O.C.)
  IPV6 Web Logo  Level A conformance, Web Accessibility Service Web Content Accessibility Guidelines
business hours:AM 08:30 ~ PM 05:30
+886-2-2349-2900      FAX:+886-2-2349-2491
Best browse in 1024*768 pixel with IE 6.0 and Firefox 3.0 or above          You are from the November 2001 visit since friends 2052276